Gas Cylinder Bottle CNC Mill Loader and
Hydraulic Fixture Clamping
Various Bottle Sizes
Loads into Horizontal Milling Machine
and Hydraulic Clamping for machining
Quick Changeovers
Gas Cylinder Bottle Hardness Testing Conveyor
Part Recipe Storage
No Mechanical Changeovers
Servo Controlled Indexing Conveyor
Automatic Plastic Rod End Prepping Machine
Slot and Drill one end, Drill second end
Bundle Loads
Fast 6 second cycle time
Single Spindle Lathe Unloader
Finished Part Unload 12"-60" long,
0.25"-2.5" diameter
All Finished Part contact with Unloader
are plastic
Automatic operation interfaced with
Lathe
(3) Double End Chamfering Machines
Capacity: 1"-2" Diameter, 12"-24" Long
No Changeover for Length variations
Stamped one end of finished rods
Automatic Double End Chamfering Machine
1/2" - 3" Diameter Bars, 10'-24' Long
Round, Hex and Square Bars
10,000 LBS Bundle In and Out
20 Minute Changeovers (No Changeover for
length variations)
13-20 Second Cycle Time
These are just a few examples of the equipment
that we have designed, manufactured and
assembled all at our facility. For more
information or a quote on your application
please contact us.